Wheels are Working…
Miraculously my car is working again. Don’t ask me what the trouble was. It hadn’t been driven since Saturday morning so it couldn’t have been vapor lock, plus if it had been that I think it would have tried to turn over. But, whatever it is, my car started for DH last night. It’s still going into the shop for a once over and the oil change and all that fun maintenence stuff. I’m glad it’s working again, though there are more than a few things that could use doing other than sitting at the garage for 1.5-2 hours this afternoon. We leave so soon and DH just sent me an alarmingly long list of “to dos” that he wants done before we leave (thankfully most are on his plate but then I usually feel I’m in the way if I’m not helping with something). This is another of those annoying things that bugs me. He suddenly gets a bug to have everything completely spic and span - including mopping kitchen floors and doing all possible laundry (even down to the unmatched socks) right before a trip. Nine times out of ten it means us leaving 2-4 hours later than he has told me we were going to leave.
EDIT: Can we tell I’m PMS-ing? Not exactly prime time to be prepping for a long road trip with little time at the destination. *sigh*
I see much knitting to reduce stress in the next 1.5 days….

Here is where I’m at on the Wear-Everywhere Pullover. I’m working the pattern on the smaller needles and am roughly 1 inch from switching to the larger needles. Once I switch to the larger needle I’ll be moving Leaf Lace onto this circ, even though it is a ridiculous 47″ long. I’ll get into why tomorrow (and hopefully I will have it moved by then if I’m lucky). If only I had a circular knitting needle fairy *swoon* . . .
Oh, and I just remembered that one of my favorite bead stores is within walking distance of the garage so perhaps I’ll browse their selection for the beads to put on my leaf lace shawl . . .
























